Walgreens on Magazine – Update 10/25/12
Things are moving fast at Magazine Street Walgreens. We now have laid the starting course of cast stone on the front elevation, from there on up we will see the brick veneer going up which will help define the window openings. The roofing is now complete, building totally dried in and HVAC Units are in place. Ductwork is now underway inside as well as a flurry of activity of Drywall Studwork, Electrical Rough-in and some of the remaining selective demolishing work. The Walgreens specified tile flooring is being manufactured and due to ship from Italy in early December, this store will not look like your typical Walgreens….we can’t wait to see it either!
Walgreens on Magazine – Update 10/15/12
The Magazine Street Walgreens project is really taking shape, the great weather has allowed the roofing to be completed as well as the final topping out of the new rear wall. The front façade stone and brick were delivered last week, and final touches on the front were done to allow the veneer to start today, Monday October 15th. Interior progress is moving along at a fast pace, drywall framing, sprinkler rough in, electrical and plumbing rough in work is happening just about everywhere you look.
Walgreens on Magazine – Update 9/21/12
The Front Elevation of the Magazine Street Walgreens is now taking shape with the installation of the Structural Steel Framing and Heavy Gauge Metal Stud Work. The front sidewalk (not seen) will also be completely replaced with new concrete and brick paver accents to create a beautiful new entry point for the store. The inside of the store is buzzing with Construction Activities this week with Electrical, Mechanical, Roofing, Metal Stud Framing, Concrete and Masonry work everywhere. We are making great progress, stay tuned for more.